Definition of blowout preventer in US English: blowout preventernoun A heavy valve or assembly of valves fitted at the top of an oil well during drilling and closed in the event of a blowout. Example sentencesExamples - We also have an option now available to us to actually put a valve or new blowout preventer on top of the existing one.
- It's supposed to trigger the blowout preventer to shut the well.
- There is now an ROV in the water 24/7, keeping careful watch over the relief well's blowout preventer.
- The report attributes the failure of the blowout preventer mostly to maintenance issues that would have been the fault of companies other than BP.
- On top we have the blowout preventer from the original event with the capping stack on top of that.
- The work should not affect a second system that is collecting 8,000 to 9,000 barrels a day from a pipe lower on the blowout preventer.
- Engineers will remove a cap and install a new blowout preventer.
- More than six weeks after BP's ruptured well was capped, crews today began removing the blowout preventer.
- The safety of oil drilling depends on the reliability of a blowout preventer.
- The blowout preventer will probably make it to the surface.
- You may have been the first person to detect a problem with that blowout preventer.
- They will do that to raise the blowout preventer which officials say is key to help determine what caused the gulf oil disaster.
- Crews are set to remove the temporary cap today so they can replace the blowout preventer, then seal the well once and for all.
- But on April 20th, the blowout preventer simply did not work.
Definition of blowout preventer in US English: blowout preventernoun A heavy valve or assembly of valves fitted at the top of an oil well during drilling and closed in the event of a blowout. Example sentencesExamples - They will do that to raise the blowout preventer which officials say is key to help determine what caused the gulf oil disaster.
- The safety of oil drilling depends on the reliability of a blowout preventer.
- It's supposed to trigger the blowout preventer to shut the well.
- But on April 20th, the blowout preventer simply did not work.
- We also have an option now available to us to actually put a valve or new blowout preventer on top of the existing one.
- More than six weeks after BP's ruptured well was capped, crews today began removing the blowout preventer.
- The blowout preventer will probably make it to the surface.
- The work should not affect a second system that is collecting 8,000 to 9,000 barrels a day from a pipe lower on the blowout preventer.
- You may have been the first person to detect a problem with that blowout preventer.
- Engineers will remove a cap and install a new blowout preventer.
- Crews are set to remove the temporary cap today so they can replace the blowout preventer, then seal the well once and for all.
- The report attributes the failure of the blowout preventer mostly to maintenance issues that would have been the fault of companies other than BP.
- On top we have the blowout preventer from the original event with the capping stack on top of that.
- There is now an ROV in the water 24/7, keeping careful watch over the relief well's blowout preventer.
|