1888 J. Muir 460 It is moved from camp to camp by the ‘logging’ railway.
1926 7 July 1/7 Construction of logging railways and similar facilities will be proceeded with..for the re~opening of the logging camps in September.
1969 9 Mar. 12/1 I used shank's mare along the logging railway to what was referred to as Headquarters Camp.