DictionarySeecritical path analysisCritical path method
critical path method[′krid·ə·kəl ′path ‚meth·əd] (systems engineering) A systematic procedure for detailed project planning and control. Abbreviated CPM. Critical path method (CPM)A construction scheduling device that diagrams the interrelationships between activities and identifies the critical path that optimizes the sequence of operations to minimize the construction period.critical path method, CPMA system of project planning, scheduling, and control which combines all relevant information into a single master plan, permitting the establishment of the optimum sequence and duration of operations; the interrelation of all the efforts required to complete a construction project are shown; an indication is given of the efforts which are critical to timely completion of the project.AcronymsSeeCPM |