1891 ,Tenoner.
1944 J. C. Jones in N. W. Kay x. 227/1 The rails are first fed into the tenoner edgeways up for the machining of the haunchings.
1971 24 Sept. 532 Mr Taylor has retained in use with the new line a Schwabedissen double end tenoner with overhead beam.